aethera

Work, described by what changed.

Six projects. Each one lists the problem as the client stated it, what we built, and the number that moved.

Manufacturing2025
Garment manufacturing holding

One operating system for a garment holding

Factory, salon network, warehouse and couriers now work in a single system instead of phone calls and notebooks.

staff roles in one system
17
staff roles in one system
platforms: API, mobile, desktop, web
4
platforms: API, mobile, desktop, web
Read the case
Retail2025
Salon retail network

A sales floor that runs on touch kiosks

Salon and warehouse staff work on touch-screen POS devices — no mouse, no keyboard, no training week.

screens in the kiosk app
34
screens in the kiosk app
interface languages
2
interface languages
Read the case
Education2026
Film education studio

A course platform the studio runs without us

Live in production: students watch paid lessons, the studio manages everything from an admin panel without a developer.

developer steps to publish a lesson
0
developer steps to publish a lesson
video sources supported
3
video sources supported
Read the case
Fintech2025
Installment retail chain

Installment sales without the paper contract pile

Sellers issue installment plans from a phone; schedules, debts and reminders track themselves.

modules in the seller app
7
modules in the seller app
apps: mobile, admin, API
3
apps: mobile, admin, API
Read the case
Agriculture2026
Agro product venture

A farm ledger that works where there is no signal

Animals, feed, stock and money are tracked fully offline on a phone — the barn does not have Wi-Fi.

modules, from pedigree to finance
10
modules, from pedigree to finance
languages out of the box
3
languages out of the box
Read the case
Agriculture2026
Feed trade network

Feed-point sales with costs the staff cannot see

Owners see cost and profit; hired sellers see only what they need to sell. Both work offline.

roles with separated visibility
2
roles with separated visibility
of the day works offline
100%
of the day works offline
Read the case
Logistics2026
Oqtepa Logistics

Dispatch moved off paper in nine weeks

Delivery confirmations arrive in minutes instead of the next morning.

dispatch handling time
-63%
dispatch handling time
trips per month tracked
1 400
trips per month tracked
Read the case
Retail2026
Zamin Retail

Eleven stores on one stock ledger

Stock counts stopped disagreeing between the shop floor and the warehouse.

stores unified
11
stores unified
stock write-offs
-41%
stock write-offs
Read the case
Healthcare2025
Shifo Clinics

Patient records that survive an inspection

Visit history, prescriptions and billing live in one record with a full audit trail.

branches migrated
3
branches migrated
records lost in migration
0
records lost in migration
Read the case
Manufacturing2025
Nurafshon Textile

Production orders wired to the shop floor

Order status is read from the line, not estimated in a meeting.

order lead time
-28%
order lead time
production lines connected
6
production lines connected
Read the case
Fintech2025
Kredo Finance

Loan applications read themselves

Document intake dropped from twenty minutes to under two.

manual data entry
-89%
manual data entry
field extraction accuracy
97%
field extraction accuracy
Read the case
Distribution2024
Turon Foods

Field sales without the evening paperwork

Orders reach the warehouse while the agent is still with the customer.

field agents
120
field agents
order-to-warehouse delay
-75%
order-to-warehouse delay
Read the case
Contact

Tell us what is not working.

A short description of the problem is enough to start. We reply within one working day, and the first conversation is free.